Commercial Fees

COMMERCIAL CONNECTION FEES (based on Tap size)
Tap Size Connection Fee Tap Size Connection Fee
3/4 " $75 4" $400
1" $100 6" $600
1.5" $150 8" $800
2" $200 10" $1000
3" $300 12" $1200
 
COMMERCIAL TAP FEES & RESIDENTIAL TAP FEES ABOVE 3/4"  (Installed by District)
Tap Size Tap Fee  
3/4" Tap $2,450.00 (incl. Meter & Inst.)
1" Tap $3,450.00 (incl. Meter & Inst.)
1 1/2" Tap $4,950.00 (incl. Meter & Inst.)
2" Tap $6,450.00 (incl. Meter & Inst.)

 

COMMERCIAL DEVELOPMENT OR INDIVIDUAL COMMERCIAL TAP FEES

(Contractor Installed and does not include Meter)

Tap Size Tap Fee Tap Size Tap Fee
3/4" Tap $2,200.00 4" $8,700.00
1" Tap $2,700.00 6" $12,700.00
1 1/2" Tap $3,700.00 8" $16,700.00
2" Tap $4,700.00 10" $20,700.00
3" Tap $6,700.00 12" $24,700.00

All Commercial Taps will be subject to Commercial Capacity Fees including Conversion of existing structures to Commercial Use.  Commercial Watering Taps will follow the above schedule.

FIRE LINE TAPS (Contractor will install and will pay applicable Fire Line Meter Fee)

Tap  Size Tap Fees
2" $4,700.00
4" $8,700.00
6" $12,700.00
8" $16,700.00
10" $20,700.00
12" $24,700.00

 

FIRE LINE TAPS Metered Solely by a Detection Meter, Monthly (Billing is as follows)

  • Number of minimum bills per size tap
  • Private Fire Hydrants @$15.00 each
  • Sprinkler Heads @$.15 each 

FIRE LINE TAPS Metered by a Detection Meter and Turbo Fire Line Meter

The sum of unit bills (based upon the minimum rate) equal to the fire line water meter inch (for example, a 3 inch fire detection  meter would equal 3 x's a minimum bill rate), plus the charges for actual metered usage billed in accordance with the rate schedule in effect at the time.

FIRE LINES are not subject to Facility Charges